Video giới thiệu toàn cầu - tiếng Malaysia

Factory Video - tiếng Mã Lai
June 27, 2024
Category Connection: Chất thải từ bãi rác
Brief: Discover our Deep Technical Scheme for treating palm oil wastewater with leachate from domestic and industrial sources. This comprehensive solution meets municipal engineering standards, offering detailed design plans, cost estimates, and operational guidance. Perfect for sustainable wastewater management.
Related Product Features:
  • Comprehensive design plan including specifications, estimates, and drawings.
  • Detailed analysis of water quality, treatment characteristics, and process routes.
  • Includes labor safety measures, fire protection, and construction schedules.
  • Detailed operating cost analysis covering land area, power consumption, and resource usage.
  • Customizable solutions based on customer-provided data and requirements.
  • Provides process comparison and ensures the chosen route meets owner's needs.
  • Includes detailed electrical and automation design with professional calculations.
  • Offers construction, commissioning plans, and operation manuals for seamless implementation.
Câu hỏi thường gặp:
  • What information do customers need to provide for this scheme?
    Customers need to provide basic project information, hydrological data, emission standards, available electricity load, and any specific requirements or preliminary materials like environmental impact assessments.
  • What does the design plan include?
    The design plan includes detailed process diagrams, equipment lists, structural designs, electrical and automation plans, and comprehensive cost and operational analyses.
  • How long does it take to complete the plan?
    The plan duration ranges from 10 to 45 working days, delivered as a PDF electronic version.
  • What is the fee structure for this service?
    Fees start at 10,000 yuan, with a maximum of 30,000 yuan, or 0.3% of total investment. Special processes or renovations may incur additional costs.